Gas Protection Measures, Trafford Park, Manchester

Client: Marshall Construction

 
The site, which had been remediated for warehousing development, had hydrocarbon contaminated materials resulting from historical usage and soil gas derived from peat and degradable material in the Made Ground.
 
Full gas protection measures had been proposed by the building designer.  However, following a quantitative risk assessment in accordance with CIRIA 152 protocols, we considered that the sources of gas previously recorded at the site had effectively been removed.  This allowed the gas protection measures to be reduced to a gas membrane only, thus removing the passive vent matting from the scheme design. This led to major cost and programme savings for the client.
News
26/08/2010
- CARD opens new Scotland Office

18/06/2010
- Nick Langdon has won a Steve Tebb Schools Outreach Award

18/05/2010
- Cathy Lee awarded CEnv

14/05/2010
- James Suttill joins CARD

26/04/2010
- Fromelles Commonwealth War Grave